You are viewing an archived web page, collected at the request of United Nations Educational, Scientific and Cultural Organization (UNESCO) using Archive-It. This page was captured on 01:01:39 Apr 05, 2023, and is part of the UNESCO collection. The information on this web page may be out of date. See All versions of this archived page.
Loading media information hide

Take advantage of the search to browse through the World Heritage Centre information.

i
ii
iii
iv
v
vi
vii
viii
ix
x

Jelling Mounds, Runic Stones and Church

Denmark
Factors affecting the property in 2009*
  • Temperature
  • Water (rain/water table)
  • Wind
  • Other Threats:

    surface deterioration of two runic stones, part of the overall property

International Assistance: requests for the property until 2009
Requests approved: 0
Total amount approved : 0 USD
Missions to the property until 2009**

November 2008: ICOMOS advisory mission

Conservation issues presented to the World Heritage Committee in 2009

The World Heritage Centre was informed about concerns over the surface deterioration of two runic stones, part of the overall property which includes a ship burial, two burial mounds, a manor, palisade, burial chamber and, as a later addition, a church with its churchyard. The setting is an open landscape.

 

Due to the conditions of the two carved Jelling runic stones, which stand in front of the church, the National Museum of Denmark was requested by the Diocese of Haderslev in March 2003, to propose a programme of non-destructive scientific studies. Funds became available in January 2006, and the National Museum obtained permission from the Heritage Agency of Denmark, the Diocese, and from Jelling Church Council to carry out the programme. The Danish National Committee of ICOMOS was informed.

 

The objectives of the programme were a) to provide an assessment of the state of conservation of both runic stones and b) to identify the imminent and long-term measures required in order to preserve the stones for posterity. The programme was initiated in October 2006, and a report of March 2008 described the findings. It concluded that there was a need for urgent intervention and some degree of protection.

 

The Director of the Danish Ministry of Culture asked the World Heritage Centre for advice, and requested an expert mission to discuss relevant conservation findings. This advisory mission, consisting of two ICOMOS experts, visited the property on 15 November 2008. The advisory mission report is available at the following web address: https://whc.unesco.org/fr/sessions/33COM/

 

Although the mission findings focus on the condition of the runic stones, the stones cannot be considered separately as they are an integral part of the whole property and any remedial activities must be judged accordingly. The mission found both stones to be in a precarious condition, requiring urgent action. Cracks have appeared in the stones, the carvings are seriously eroding, and the surface is foliating. There is evidence to suggest that regular mechanical cleaning has also harmed the surface. Positioned and unprotected in the open air, the stones are exposed to the effects of serious weathering, with active surface and sub-surface biological activity enhanced by nearby trees, and with the real potential of surface water in the cracks and fissures causing significant surface loss of stone and carvings during winter through ice expansion. Combined with direct human contact, tree root penetration on the "original" archaeology, and the possibility of vandalism and mechanical damage caused by machines, they are under significant risks that need to be addressed as a matter of urgency.

 

The mission considered that the stones should remain in their current position and not be moved. Furthermore, the mission recommended that the stones should be protected by an environmentally appropriate building attached to the church’s porch. Details of the proposed building should be provided to the World Heritage Centre for review by ICOMOS at the earliest opportunity, and before any firm commitments have been made. The proposed building should be conceived as an addition to the church, be visually differentiated from the main church structure, have climatic control and should have managed visitor access.

 

As the church and the church yard including the runic stones are protected under the Churches and Church Yards Consolidated Act of 1992, any alteration to the church or church yard requires approval by the diocesan authorities after consulting the National Museum.

 

The mission further recommended that traffic between the church and the museum should be restricted and follow a different route, according the proposed plan for the area; Consideration should be given to extending the buffer zone to include the palisade and the adjacent lime trees to the stones, which should continue to be pruned, but not felled.

Decisions adopted by the Committee in 2009
33 COM 7B.98
Jelling Mounds, Runic Stones and Church (Denmark) (C 697)

The World Heritage Committee,

1. Having examined Document WHC-09/33.COM/7B,

2. Takes note of the results of the ICOMOS advisory mission to the property;

3. Requests the State Party to:

a) Urgently provide information on any conservation and development plan to address the issue of an environmental covering for the stones to the World Heritage Centre for review by ICOMOS,

b) Consider extending the buffer zone in consultation with the World Heritage Centre and ICOMOS;

4. Also requests the State Party to submit a report on the steps taken to implement the advisory mission recommendations to the World Heritage Centre by 1 February 2011 for review by ICOMOS.

Draft Decision: 33 COM 7B.98

The World Heritage Committee,

1. Having examined Document WHC-09/33.COM/7B,

2. Takes note of the results of the ICOMOS advisory mission to the property;

3. Requests the State Party to:

a) Urgently provide information on any conservation and development plan to address the issue of an environmental covering for the stones to the World Heritage Centre for review by ICOMOS,

b) Consider extending the buffer zone in consultation with the World Heritage Centre and ICOMOS;

4. Also requests the State Party to submit a report on the steps taken to implement the advisory mission recommendations to the World Heritage Centre by 1 February 2011 for review by ICOMOS.

 

Report year: 2009
Denmark
Date of Inscription: 1994
Category: Cultural
Criteria: (iii)
Documents examined by the Committee
arrow_circle_right 33COM (2009)
Exports

* : The threats indicated are listed in alphabetical order; their order does not constitute a classification according to the importance of their impact on the property.
Furthermore, they are presented irrespective of the type of threat faced by the property, i.e. with specific and proven imminent danger (“ascertained danger”) or with threats which could have deleterious effects on the property’s Outstanding Universal Value (“potential danger”).

** : All mission reports are not always available electronically.